A Sanitary latrine forms an integral part of a VAMBAY dwelling
Unit. A system of drainage from the houses should also be
provided to avoid overflow from the kitchen, bathroom etc. with
proper linkages to the city drainage. When, however, individual
toilets are not possible or affordable, the community toilets as
part of the Nirmal Bharat Abhiyan will be encouraged and
established.
Plantation
of trees in the entire habitation or around the individual house
should be taken up simultaneously. Trees may be planted near the
housing clusters so that, in due course, enough trees are
nearby. Such plantation can be taken up under the social
forestry programme.
Suitable Non-government Organisations with proven good track
record wherever available may be associated with the
construction of VAMBAY dwelling units. The supervision, guidance
and the monitoring of construction can be entrusted to these
non-governmental organisations. In particular, Non-governmental
organisations should be made use of to popularise, the use
sanitary latrines and appropriate technology. The selection of
the NGO would be in consultation with the State Nodal Agency.
The Urban Local Body should have a complete inventory of houses
constructed /upgraded under the VAMBAY, giving details of the
date of start and the date completion of construction of
dwelling unit, name of the city, area in which the house is
located, occupation and category of beneficiary and other
relevant particulars.
On completion of VAMBAY dwelling unit, the concerned Urban Local
Body should ensure that for each house / colony so constructed,
a display board indicating, the proper Logo, year of
construction, name of beneficiary etc.
At the State level SUDA and HUDCO will jointly monitor
the scheme. The monitoring of the programme at the State level
will be the responsibility of a State level co-ordiantion
committee (SLCC) for urban housing.
At ULB level, Town Advisory Committee headed by the Chairperson
of ULB shall monitor. Separate Community based monitoring will
be done by the Community Development Society (CDS). The Project
Officer of the CDS and Secretary of the ULB shall closely
monitor all aspects of VAMBAY through visits to work sites. A
schedule of inspection, which prescribes minimum number of field
visits for each supervisory level functionary from the State
level to the ULB level shall be drawn up and strictly adhered
to.
The Secretary of the concerned ULB shall furnish monthly
progress report before 10th of every month to the Executive
Director, SUDA with a copy to the District Mission Co-ordinator.
The houses shall be completed positively within 3 months from
the release of 1st installment. The Municipal Secretaries of Urban Local Bodies
shall be furnished UCs to SUDA within 3 months of the fund
release.
The implementation of the VAMBAY would be dovetailed and
synergised with other programme such SJSRY and NSDP.
The State Nodal Agency should conduct periodic evaluation
studies on the implementation of VAMBAY. Evaluation studies
should be got conducted by reputed institutions and
organisations on issues identified during concurrent evaluation
and reviews by the State Nodal Agency as well as by the
Government of India. Copies of these studies should be furnished
to the Government of India and remedial action should be taken
by the State Nodal Agency on the basis of the findings of these
studies.