| JNNURM Projects - MISSION CITIES | ||||||
|
Sanctioned Urban Infrastructure and Governance Schemes as on December, 2008 (Rs. in crores) |
||||||
| Sl. | Name of Project | Agency | Project Cost | GOI Share | GoWB Share | ULB Share |
| 2006 - 2007 | ||||||
| 1 | 15 MGD water treatment plant for Hooghly Chinsurah and Bansberia Municipalities (W) | KMWSA | 44.92 | 15.72 | 29.20 | nil |
| 2 | 10 MGD water treatment plant for Uluberia (W) | KMWSA | 45.58 | 15.95 | 29.63 | nil |
| 3 | Integration of Maheshtala UGR with the existing water distribution network of Maheshtala Mupty. (W) | KMWSA | 17.17 | 6.01 | 11.16 | nil |
| 4 | 3 MG UGR-cum-Boosting Stn. at Metiabruz, Akra (Gandhi Maidan) (W) | KMWSA | 10.66 | 3.73 | 6.93 | nil |
| 5 | 30 MGD (Ph-I) water treatment plant at Dhapa (W) | KMC | 98.75 | 34.56 | 34.56 | 29.63 |
| 6 | Construction of flyover between E.M. Bypass and Kazi Nazrul Islam Sarani. (T&T) | KMDA | 38.02 | 13.31 | 13.31 | 11.41 |
| 7 | Rehabilitation / upgradation of man entry Brick Sewerage Supplies (Pt.-I) for the city of Kolkata (S&D) | KMC | 402.91 | 141.02 | 141.02 | 120.87 |
| 8 | Trans-municipal Scheme on removal of drainage congestion within Khardah, Panihati, North Dum Dum, Dum Dum & South Dum Dum. (S&D) | KMDA | 45.30 | 15.86 | 15.86 | 13.59 |
| 9 | 42 MGD water supply project for Ranigunj under Asansol urban area, West Bengal. (W) | ADDA | 36.27 | 18.14 | 12.69 | 5.44 |
| 10 | 22.7 MGD water supply project in Jamuria. (W) | ADDA | 14.53 | 7.27 | 5.09 | 2.18 |
| 11 | 7 MGD water treatment plant together with reservoir, distribution system and other allied works at Durgapur. (W) | ADDA | 28.78 | 14.39 | 10.07 | 4.32 |
| 12 | Upgradation of non-man Brick Sewerage Supplies ((Pt.-I) for the city of Kolkata.) (S&D) | KMC | 97.12 | 33.99 | 33.99 | 29.14 |
| 13 | Municipal SWM System for Asansol Urban Area. (SWM) | ADDA | 43.57 | 21.79 | 15.25 | 6.54 |
| 14 | Improvement of drainage at Howrah (S&D) | KMDA/HIT | 93.38 | 32.68 | 14.01 | 46.69 |
| 15 | Municipal SWM in municipal towns with land ownership for SWM activities.(Garulia, North Barrackpore, Barrackpore, Budge Budge, Bansberia, Hooghly-Chinsura-, Kamarhati, Rajarhat-Gopalpur, Rajpur-Sonarpur & Bally. (SWM) | KMDA | 56.59 | 19.81 | 19.81 | 16.98 |
| 16 | Water supply project for Baruipur (W) | KMDA | 9.52 | 3.33 | 6.19 | nil |
| 17 | 10 MGD water supply scheme for Asansol (W) | ADDA | 89.88 | 44.94 | 31.46 | 13.40 |
| TOTAL: | 1172.95 | 442.49 | 430.21 | 300.17 | ||
| 2007 - 2008 | ||||||
| 18 | Surface Area Water Supply for added area of Howrah Municipal Corporation. (W) | KMWSA | 90.69 | 31.74 | 31.74 | 27.21 |
| 19 | 15 MGD Integrated Water Supply System at Palta linking North Barrackpore and Barrackpore Municipalities (W) | KMWSA | 129.51 | 45.33 | 45.33 | 38.85 |
| 20 | Left Turning off-Ramp at Beckbagan (Exit Ramp from AJC Bose Road Flyover. (T&T) | Transport Deptt. | 18.06 | 6.32 | 6.32 | 5.42 |
| 21 | Interchange at Dunlop Junction of B.T. Road and PWD Road (T&T) | PWD | 37.56 | 13.15 | 13.15 | 11.27 |
| 22 | E.M Bypass connector from Padmapukur to Kamalgazi. (T&T) | KMDA | 53.10 | 18.59 | 18.59 | 15.93 |
| 23 | Water Supply Scheme for Sector-V, Salt Lake. (W) | JUSCO | 26.07 | 9.12 | 9.12 | 7.82 |
| 24 | 24X7 surface water supply scheme for municipal towns of Nalhati, Halisahar, Kanchrapara, Gayeshpur and uncovered areas of Kalyani. (W) | KMDA | 141.94 | 49.68 | 49.68 | 42.58 |
| 25 | 24X7 Water Supply Scheme for Chandannagar Municipal Corporation.(W) | Ch.M.C. | 25.22 | 8.83 | 8.83 | 7.57 |
| TOTAL: | 522.15 | 182.75 | 182.75 | 156.65 | ||
| 2008-2009 | ||||||
| 26 | Laying of water supply pipeline between Tala & Palta (W) | KMC | 305.00 | 106.75 | 106.75 | 91.50 |
| 27 | Vivekananda Flyover (Ph-I) - connectiong Howrah Bridge Approach to Girish Park (T&T) | KMDA | 153.00 | 53.55 | 53.55 | 45.90 |
| 28 | Nagerbazar Flyover (T&T) | KMDA | 49.00 | 17.15 | 17.15 | 14.70 |
| 29 | Development of Sewerage & Drainage for Sector-V, Salt Lake (S&D) | JUSCO | 34.00 | 11.90 | 11.90 | 10.20 |
| 30 | Garulia Water Supply Scheme (W) | KMDA | 49.00 | 17.15 | 17.15 | 14.70 |
| TOTAL: | 590.00 | 206.50 | 206.50 | 177.00 | ||
| GRAND TOTAL: | 2285.10 | 831.74 | 819.46 | 633.81 | ||